Shelair
    Brisbane, Gold Coast and Sunshine Coast

    Pre-Settlement HVAC Inspection

    A written condition report on the commercial air conditioning before settlement or lease start. Cold rooms and refrigeration on the same visit. For buyer's agents, brokers and solicitors.

    Commercial HVAC specialistsSE QLD coverage5-year workmanship guarantee
    Pre-Settlement HVAC Inspection
    PDF
    For the solicitor's file
    Same week
    Usual attendance
    SE QLD
    Sunshine Coast to Gold Coast
    Since 1993
    Commercial HVAC

    What's Included

    A packaged unit that is running on the day of the inspection is not the same thing as a unit the incoming tenant can live with. Shelair inspects commercial air conditioning before settlement and writes the result in a form a solicitor can put on the file. Sellers already ask us to get a failed system going long enough to hand the building over. This service records age, refrigerant, what was running, and the defects that will sit with the buyer or the incoming tenant. Cold rooms and refrigeration on the premises are included on the same visit.

    Request a Commercial Quote

    Key Benefits

    • Report written for a conveyance file, not a service docket
    • Packaged, ducted, VRV/VRF and split systems serving the tenancy
    • Cold rooms, freezer rooms and commercial fridges on the same visit
    • Nameplate data where readable: brand, model, refrigerant, approximate age
    • Photographs and a defect list ranked by what should be raised before settlement
    • Attendance from the Sunshine Coast to the Gold Coast

    How It Works

    1

    Instruct

    Call 07 3204 9511 or email info@shelair.com.au with the address, access and the date the PDF is needed.

    2

    Quote

    We quote a fixed fee from the number of systems and cold rooms.

    3

    Inspect

    A technician attends, inspects running plant, and does not dismantle it.

    4

    Issue

    The PDF is sent to the instructing party before the nominated date.

    Frequently Asked Questions

    Do you inspect before a commercial lease starts, or only on a sale?

    Both. Incoming tenants use the same report before they take possession, particularly where the lease makes them responsible for air conditioning from day one.

    Is a building and pest report enough?

    No. A building inspection does not record refrigerant, compressor condition, cold-room temperature or whether a rooftop package unit is near the end of its life.

    Can you attend on short notice before settlement?

    Yes. Most reports are booked inside the same week. Access is the usual delay.

    What does the report not do?

    It does not certify NCC compliance, it does not guarantee the plant will not fail, and it will not find every internal defect. It records what a licensed technician could see and test on the day.

    Is this the same as getting the system going for handover?

    No. Getting plant running for handover is a repair. This is a written condition report.

    Need the PDF before settlement?

    Send the address, access arrangements and the date the report is needed.